Design is the easy half. The forms get cut, the lime gets slaked, the pour happens at six in the morning because the caliche will not wait for a convenient hour. This is the part of Noon that gets dirty — what we make, what we make it out of, and how.

What we make

Built objects, not renderings.

Every category below exists on the ground in South Texas, built by this shop. Specifications are what was actually done — not a catalogue range.

Cast concrete landmarks

Monolithic forms struck from birch, assembled to tolerance off-site, poured on location in a single continuous placement. Geometry set out by hand from a drawn centre.

Largest to date · 28 ft diameter
Formwork · birch ply, hand-cut
Placement · single pour, on grade

Water systems

Acequia channels running on gravity over limestone, closed-loop fountains, and basins finished in tadelakt — waterproofed by the plaster itself rather than by a membrane or a sealant.

Gravity-fed · no pumps where grade allows
Basin finish · tadelakt lime
Solar-run circulation on installed work

Stormwater & earthworks

Bioswales cut to hold and infiltrate rather than shed. River rock over filter fabric, planted margins, sized to the roof and drive area actually feeding them.

Measured intake · ~200 gal/hr
Area relieved · ~2,000 sq ft
In service since 2025

Mineral surfaces

Lime plasters applied by trowel and burnished — marmorino, limewash, tadelakt. Surfaces that cure by pulling carbon dioxide back out of the air and returning to stone.

Binder · slaked lime putty
Aggregate · marble dust
No acrylic, no latex, no sealer

Dry stone & veneer

Hand-laid stone walls and stone veneer, set to read as though the ground produced them. Local stone wherever the site and the budget agree.

Laid by hand · no mechanised setting
Regional stone sourcing

Planting as structure

Native and heritage palettes chosen for the exposure they will actually live in, planted into caliche the way caliche requires — not the way a nursery tag suggests.

Palette · South Texas natives + mission heritage
Soil analysis · Texas A&M AgriLife lab
Materials

We publish the chemistry.

Anyone can name a material on a capabilities page. These are the ones we build with, each one written up in full in our open library — what it is, why it behaves the way it does, and where it fails. If we did not understand it, we could not have written it.

The sequence

How a thing gets made.

Read the ground

Grade, drainage, exposure, and soil before geometry. Soil goes to the AgriLife lab. Where the water already wants to travel decides most of what follows.

Set out and cut the forms

Geometry struck from a drawn centre. Formwork cut from birch ply and assembled to tolerance off-site, then carried in and set on grade.

Pour

One continuous placement. Cold joints are decisions you live with for fifty years, so the work is staged to avoid them — which is why pours start before dawn in August.

Cure, strike, finish

Forms come off when the concrete says so. Mineral finishes go on by trowel and get burnished by hand — the surface is worked, not coated.

Plant and commission

Water run and adjusted, planting set into prepared caliche, and the whole thing handed over with the numbers written down.

Come back and measure

The part most builds skip. We return, take readings, and publish what we find — including when it underperforms.

Pour day — the Lotus, a single continuous placement.
Birch formwork assembled by hand.
Birch formwork, cut and assembled by hand.
Cast concrete vessels.
Cast vessels — the same method at table scale.
Marmorino lime plaster surface.
Marmorino — lime and marble dust, burnished.
Hand-laid stone wall.
Stone, laid by hand.
Bioswale taking water during a storm.
The bioswale doing its job, mid-storm.
Acequia channel running on gravity.
Acequia channel — gravity over limestone.
The record

Numbers, with their provenance.

Every figure here is something we measured or built, not a capability estimate.

28 ftDiameter of the cast concrete Lotus, poured in one placementBuild record
~200 gal/hrBioswale intake. Not a lab infiltration test — it varies with storm intensityField-observed
~2,000 sq ftRoof and drive area relieved by that swaleDesign spec
2025Year the swale went into service and has run sinceStanding condition
36Methods published open and cited in the Source libraryPublished record
Straight about scale

What we are, and what we aren’t.

We are a small shop that builds its own work. That is the whole proposition, and it cuts both ways:

  • The making is not subcontracted. The person who drew it is on site when it pours.
  • We are not a production facility. We build a small number of things properly rather than many things quickly.
  • We work in lime, pozzolan, stone, and native plants — not in vinyl, latex, or anything that has to be replaced in ten years.
  • We measure after and publish it, including the results that are less flattering than the render.
Bring us a site →